Vastwin

Wuhan Metro Line 8 Shield Machine Transportation Project

From:广瀛物流 Posted on:2019-10-16 Belong to:Municipal construction


Working hours: August-September 2017 
Project Location: Wuhu, Wuhan 
Equipment specifications: 1 diameter 12.51m shield machine and supporting equipment 
Put into the vehicle: 12-axis +1 PPU 
Job content: loading and unloading from the place of shipment in Wuhan to the storage location and unloading at the storage location.